2017 12th International Conference on Live Maintenance (ICOLIM) 2017
DOI: 10.1109/icolim.2017.7964151
|View full text |Cite
|
Sign up to set email alerts
|

A feasibility study of live working in Turkish electricity distribution system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…For the live working of the distribution network, the operating point voltage needs to be kept below the safe voltage. However, due to the existence of the measurement distance error at the zero-potential live working point, the safety of the live working operator is seriously jeopardized [2][3] . Therefore, the research on measuring the distance error of the zero potential live working point has received more and more attention and attention.…”
Section: Introductionmentioning
confidence: 99%
“…For the live working of the distribution network, the operating point voltage needs to be kept below the safe voltage. However, due to the existence of the measurement distance error at the zero-potential live working point, the safety of the live working operator is seriously jeopardized [2][3] . Therefore, the research on measuring the distance error of the zero potential live working point has received more and more attention and attention.…”
Section: Introductionmentioning
confidence: 99%
“…With the rapid development of China's power grid and the continuous improvement of power supply reliability requirements [1], the research and standardization work of the live working technology has become a new development and breakthrough [2]. If the fault cannot be removed within a short time, it would affect the reliability of the power supply and the quality of the power supply [3][4].…”
Section: Introductionmentioning
confidence: 99%