2020
DOI: 10.1007/s40747-020-00177-w
|View full text |Cite
|
Sign up to set email alerts
|

A fuzzy mid-term capacity and production planning model for a manufacturing system with cloud-based capacity

Abstract: Most of the past cloud manufacturing (CMfg) studies investigated the short-term production planning or job scheduling of a CMfg system, while the mid-term or long-term capacity and production planning of a CMfg system has rarely been addressed. In addition, most existing methods are suitable for CMfg systems comprising three-dimensional (3D) printers, computer numerical control (CNC) machines or robots, but ignore the coordination and transportation required for moving jobs across factories. To fill these gaps… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 47 publications
0
4
0
Order By: Relevance
“…In this same vein, our findings corroborate recent studies that have proposed using some Industry 4.0 technologies in the production levelling process. According to Chen and Wang (2021), cloud manufacturing can be utilised for production levelling in scenarios where an operation's capacity is inadequate. In such cases, the factory can acquire additional capacity from a cloud service provider to make up for the deficiency.…”
Section: Performance Improvement In Manual Assembly Linesmentioning
confidence: 99%
“…In this same vein, our findings corroborate recent studies that have proposed using some Industry 4.0 technologies in the production levelling process. According to Chen and Wang (2021), cloud manufacturing can be utilised for production levelling in scenarios where an operation's capacity is inadequate. In such cases, the factory can acquire additional capacity from a cloud service provider to make up for the deficiency.…”
Section: Performance Improvement In Manual Assembly Linesmentioning
confidence: 99%
“…Sun et al [61] investigated a green road-rail intermodal routing problem with improved pickup and delivery services under uncertainty. Chen and Wang [13] proposed a fuzzy mid-term capacity and production planning model for a manufacturer with cloud-based capacity.…”
Section: Literature Reviewmentioning
confidence: 99%
“…First, the algorithm is implemented to find the upper bound of the factor weights. Thus, for different values of alpha, models (12)(13)(14)(15) are solved based on the data given in Table 2. The results are shown in Table 3.…”
Section: Numerical Examplementioning
confidence: 99%
See 1 more Smart Citation