2014
DOI: 10.1134/s1062739114060076
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 17 publications
0
2
0
Order By: Relevance
“…Uncertainty based approaches shows practically better result than the traditional approaches in terms of production targets. [99,100]…”
Section: Equipment Selection Post-mining Land Reclamation and Schedul...mentioning
confidence: 99%
“…Uncertainty based approaches shows practically better result than the traditional approaches in terms of production targets. [99,100]…”
Section: Equipment Selection Post-mining Land Reclamation and Schedul...mentioning
confidence: 99%
“…However, due to the low scheduling accuracy (or resolution) in enormous decision units, the results are significantly different from the optimal plans, which also reduces the practicality of the results 47,49,52,53 . Therefore, many researchers make use of the unique structure of the mathematical model to reduce the model size with the Lagrange relaxation method and solve the model with other measures and algorithms, such as iteration, decomposition, gradient method, and the Dantzig network flow method [54][55][56][57][58][59][60][61][62][63][64][65][66][67][68] . The biggest obstacle to this approach is the "gap" problem.…”
mentioning
confidence: 99%