2015
DOI: 10.3233/ica-150492
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid optimization approach for sustainable process planning and scheduling

Abstract: Abstract. Process planning and scheduling are important stages in manufacturing, and good strategies can significantly improve the energy performance of manufacturing to achieve sustainability. In this paper, an innovative optimization approach has been developed to facilitate sustainable process planning and scheduling. In the approach, honey-bee mating and annealing processes are simulated to optimize multi-objectives including energy consumption, makespan and the balanced machine utilization. Experiments on… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 45 publications
(15 citation statements)
references
References 50 publications
0
15
0
Order By: Relevance
“…Nowadays, sustainable design is at the cutting edge of design of tall buildings . Sustainability can mean different things from generation of green energy on the site to water conservation and reuse to minimizing the carbon emission or footprint of the structure . Consequently, a multicriteria optimization is advocated where several different criteria are defined simultaneously such as (a) minimum cost, (b) minimum carbon emission, and (c) minimum drift.…”
Section: Diagrid Configuration and Designmentioning
confidence: 99%
“…Nowadays, sustainable design is at the cutting edge of design of tall buildings . Sustainability can mean different things from generation of green energy on the site to water conservation and reuse to minimizing the carbon emission or footprint of the structure . Consequently, a multicriteria optimization is advocated where several different criteria are defined simultaneously such as (a) minimum cost, (b) minimum carbon emission, and (c) minimum drift.…”
Section: Diagrid Configuration and Designmentioning
confidence: 99%
“…Job-shop scheduling problem (JSSP) is a typical NP-hard problem (Zhang, Luo & Dong, 2015;Li, Li, Cai, & He, 2015). EMO algorithm has been applied to JSSP by a number of researchers (Chao & Liao, 2012;Roshanaei, Balagh, Esfahani, & Vahdani, 2009).…”
Section: Applicationsmentioning
confidence: 99%
“…The goal of TSP is to find a tour with the minimum total length among all such possible tours for the given graph where each city is visited only once. Many real world combinatorial optimisation problems can be formulated as an instance of the TSP such as scheduling (Li et al 2015), routing, placement of goods and machines in the warehouse, and printed circuit design. Dowlatshahi et al (2014) applied a discrete GSA to a set of 54 Euclidean benchmark instances of TSP with sizes ranging from 51 to 2392 nodes.…”
Section: Travelling Salesman Problemmentioning
confidence: 99%