“…An optimal control model was constructed/formulated to deal with the problem, and as a result, an explicit solution along with illustrative example was presented to show applicability of the obtained results. Extra papers (Campbell, 2017;Chiu, Y. et al, 202;Chiu, Lin, & Wu, 2020;Ivanov et al, 2019;Lin et al, 2019;Lesmono et al, 2020;Mokao, 2020;Nicolaisen, 2011;Ohmori & Yoshimoto, 2021;) also addressed systems with overtime options and adjusted fabrication/output rates. This study intends to jointly decide the rotation cycle length and frequency of delivery for a multiproduct producer-retailer integrated system featuring overtime and random scrap.…”