2022
DOI: 10.17341/gazimmfd.884293
|View full text |Cite
|
Sign up to set email alerts
|

A mathematical model for line-seru conversion and scheduling problem in seru production system

Abstract: Formulating line-seru conversion and scheduling problem simultaneously.  Trying to fill the gap in the existing literature.  Validating the proposed model with two numerical examples  Figure A. Seru types Purpose:The aim of this study is to propose a mathematical model for the conversion of the assembly line to the seru production system (line-seru conversion) and scheduling problems and also try to fill the gap in the existing literature. Theory and Methods:Companies such as Sony and Canon have developed a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 33 publications
0
0
0
Order By: Relevance