2022
DOI: 10.24200/sci.2022.58131.5582
|View full text |Cite
|
Sign up to set email alerts
|

A Mathematical Model for Lot-streaming Hybrid Flow Shop Scheduling Problem by Considering Learning Effect and Buffer Capacity

Abstract: Lot streaming, is an effective technique to increase efficiency in a production system by splitting a job into several smaller parts to overlap operations between successive machines in a multi-stage production system. In this paper, a hybrid flow shop scheduling problem with lot streaming, learning effect and buffer's limitation is considered. A bi-objective mathematical model is presented for minimizing the total tardiness and the makespan. To validate the proposed model, the bi-objective model converted to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 44 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?