2021
DOI: 10.1016/j.ijepes.2020.106357
|View full text |Cite
|
Sign up to set email alerts
|

A MILP-based restoration planning method for generator start-up considering flexible re-energizing times of transmission lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 28 publications
0
6
0
Order By: Relevance
“…where V i is the voltage at the i th node, V i+1 is the voltage at (i + 1) th node, P r + jQ r is the receiving end power, P i + jQ i is the sending end power, and R + jX is the impedance of the line. Te line stability factor values are calculated using equations ( 12)- (15). Te line stability factors show four diferent values for a single line.…”
Section: Startmentioning
confidence: 99%
See 3 more Smart Citations
“…where V i is the voltage at the i th node, V i+1 is the voltage at (i + 1) th node, P r + jQ r is the receiving end power, P i + jQ i is the sending end power, and R + jX is the impedance of the line. Te line stability factor values are calculated using equations ( 12)- (15). Te line stability factors show four diferent values for a single line.…”
Section: Startmentioning
confidence: 99%
“…Te set of nodes belonging to some initial partitions are represented by a single node for simplifcation, V40 � {V1, V2, V3, V4, V5, V6, V7, V10, V11, V13, V14, V25, V30, V31, V32, V37} and V41 � {V15, V16, V17, V19, V20, V21, V22, V23, V24, V26, V27, V28, V29, V33, V34, V35, V36, V38}. Te cutting sets to separate the partitions are e (14,15), e (3,18), and e (25,26), where the maximum generation-load diference of the 1 st partition is −96.11 MVAR and the 2 nd partition is 321.18 MVAR.…”
Section: Agglomerative Hierarchical Clusteringmentioning
confidence: 99%
See 2 more Smart Citations
“…The MILP formulations can be also applied to represent other types of operations, for example, restoration. In this context, the authors of (Xie et al, 2021) develop an optimization model that can generate a flexible reenergizing of transmission lines. Besides, both start-up time and serial restoration constraints are considered.…”
Section: Introductionmentioning
confidence: 99%