Proc. 29th Annual Conference of the International Group for Lean Construction (IGLC) 2021
DOI: 10.24928/2021/0111
|View full text |Cite
|
Sign up to set email alerts
|

A Model to Link Takt Schedules and Operations in Construction

Abstract: This research paper presents a model for construction that can bridge the gap between the schedules (takt planning or location-based management) and the on-site operations using visual management (VM). The model was developed using design science. It was shaped in a modular construction environment and evaluated theoretically. The knowledge base consists of; takt planning, location-based scheduling (LBS), plan-do-check-act, and visual management. The evaluation of the model revealed that a generic model could … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 21 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?