A new approach for evaluation of risk priorities of failure modes in FMEA

Abstract: This paper presents a method for carrying out the calculus of the risk priority of failures in Failure Mode and EOE ect Analysis (FMEA). The novelty of the method consists of new management of data provided by the design team, normally given on qualitative scales, without necessitating an arbitrary and arti® cial numerical conversion. The practical eOE ects of these issues are shown in an application example.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
99
0
7

Year Published

2013
2013
2020
2020

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 158 publications
(106 citation statements)
references
References 14 publications
0
99
0
7
Order By: Relevance
“…Existen una gran variedad de escalas que permiten evaluar el grado de consecuencia, ocurrencia y detección de cada elemento de la jerarquía [30,[36][37][38][39].…”
Section: Valores Recíprocosunclassified
“…Existen una gran variedad de escalas que permiten evaluar el grado de consecuencia, ocurrencia y detección de cada elemento de la jerarquía [30,[36][37][38][39].…”
Section: Valores Recíprocosunclassified
“…The new logic synthesis expression for Risk Priority Code (RPC) to change the order of priority among indexes is the basis for our work. The new logics of synthesis expresses changed composition of the operators and tie-ranking rule which is different from one that proposed by Franceschini & Galetto [7]. The new logic synthesis is appropriate to apply for finalizing mould designs in foundries.…”
Section: Introductionmentioning
confidence: 99%
“…Hao Liu [12] proposed an extended fuzzy QFD from product planning to part deployment through a modified fuzzy k-means clustering method with fuzzy inference method for FMEA and α-cut operations to calculate the fuzzy sets in QFD. [7] and Sellapan & Karuppusami [8]. The new logic synthesis expression for Risk Priority Code (RPC) to change the order of priority among indexes is the basis for our work.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Unfortunately, such data are limited, ambiguous or even not exist due to the great uncertainty inherent in construction projects. Therefore, the quantitative approaches could not suitably and effectively handle the risks (Franceschini, Galleto 2001).…”
Section: Introductionmentioning
confidence: 99%