2010 International Conference on High Performance Computing &Amp; Simulation 2010
DOI: 10.1109/hpcs.2010.5547148
|View full text |Cite
|
Sign up to set email alerts
|

A new resource mapping technique for Grid workflows in advance reservation environments

Abstract: Advance reservation can ensure the future availability of the Grid's heterogeneous resources and help a scheduler to produce better schedules. We propose a new resource mapping technique for jobs of a Grid workflow in an advance reservation environment. Using the Dynamic Critical Path for Grid (DCP-G) scheduling algorithm's job selection method, our proposed technique considers the conditional mapping of parent and child jobs to the same resource, trying to minimise the communication duration between jobs and … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2011
2011
2016
2016

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 19 publications
0
4
0
Order By: Relevance
“…In Russell et al [2005], a novel framework of resource patterns for workflow resource management is proposed. Some approaches such as Ashraf and Erlebach [2010], Decker and Schneider [2007], and Langguth and Schuldt [2010] consider resource reservation when scheduling the workflow/business processes. In contrast, the second category is to plan resource for certain number of workflow instances at the build time.…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…In Russell et al [2005], a novel framework of resource patterns for workflow resource management is proposed. Some approaches such as Ashraf and Erlebach [2010], Decker and Schneider [2007], and Langguth and Schuldt [2010] consider resource reservation when scheduling the workflow/business processes. In contrast, the second category is to plan resource for certain number of workflow instances at the build time.…”
Section: Related Workmentioning
confidence: 99%
“…Another category is workflow scheduling/planning, which considers the workflow structure in resource allocation. Yu et al in Yu and Buyya [2005] compared some significant workflow scheduling algorithms and systems [Ashraf and Erlebach 2010;Decker and Schneider 2007;Langguth and Schuldt 2010;Senkul and Toroslu 2005;Yarkhan and Dongarra 2002;Yu and Buyya 2006] under the Grid environment. These approaches mainly deal with the run-time workflow scheduling problems.…”
Section: Introductionmentioning
confidence: 99%
“…Partner Based Dynamic Critical Path for Grid (PDCPG), proposed in [6], is based on Dynamic Critical Path for Grid (DCPG) for AR environment. For job selection, it uses same technique as of DCPG.…”
Section: Related Workmentioning
confidence: 99%
“…For efficient execution of workflow good scheduling heuristics are trivial. Partner Based Dynamic Critical Path for Grids (PDCPG) proposed in [6], is one of the proposed algorithms for advance reservation environment in Grid and is based on Dynamic Critical Path for Grids (DCPG) [7].www.ijacsa.thesai.org order to minimize the communication involved to transfer required files of the child jobs. This may lead the overall Grid to an un-balanced state in which some of the resources are highly utilized while others remain under-utilized.…”
Section: Introductionmentioning
confidence: 99%