“…Some consider a sequential static case [11], with several instants that are optimized successively and a few applications include a complete dynamic description [12]. Uncertainties naturally present in the problem (demand, renewable generation production or contingencies) have been incorporated through stochastic optimization [13], which minimizes the expected cost, or robust optimization [14], which carries out a worst-case approach. Medium term studies usually consider centralized TEP with competitive operation [15], while long-term models most frequently deal with centralized TEP with cost-based operation [16].…”