2018
DOI: 10.1016/j.jclepro.2018.02.201
|View full text |Cite
|
Sign up to set email alerts
|

A novel selective disassembly sequence planning method for adaptive reuse of buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
68
0
2

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
3
1

Relationship

1
7

Authors

Journals

citations
Cited by 120 publications
(72 citation statements)
references
References 28 publications
2
68
0
2
Order By: Relevance
“…PRM has the purpose of recovering as much of the economic and the ecological value of a product and its components as possible [16]. Also, several studies have demonstrated that the applications of green design methods, such as design for disassembly, design for deconstruction, disassembly planning, and life cycle assessment (LCA), in the building industry represent a way to fully exploit the life cycle expectancy of buildings and building materials and components [17][18][19][20][21][22][23].…”
Section: Adaptive Reuse Of Buildings In a Circular Economymentioning
confidence: 99%
“…PRM has the purpose of recovering as much of the economic and the ecological value of a product and its components as possible [16]. Also, several studies have demonstrated that the applications of green design methods, such as design for disassembly, design for deconstruction, disassembly planning, and life cycle assessment (LCA), in the building industry represent a way to fully exploit the life cycle expectancy of buildings and building materials and components [17][18][19][20][21][22][23].…”
Section: Adaptive Reuse Of Buildings In a Circular Economymentioning
confidence: 99%
“…Moreover, some use qualitative criteria and their result may depend on the assessors. However, the sequence disassembly planning for buildings (SDPB) method published in 2018 by Sanchez and Haas was based on geometric and physical parameters only and estimated the impacts of a disassembly in time and global warming potential [16]. This SDPB method has several limitations, including the fact that the possibility for future reuse is not considered and its output cannot be directly linked with design improvements.…”
Section: Aim and Scopementioning
confidence: 99%
“…Sanchez and Haas' SDPB method [16] Disassembly sequence structure graph (DSSG), automated graph plot, BIM data.…”
Section: Useful Life (In Years)mentioning
confidence: 99%
See 1 more Smart Citation
“…Because of it 1 million of virgin materials have to be mined again. These materials at minimum could be use for filling foundation pits and another kind of pits [19,20,21,22,23,24]. In the table 4 is presented divergence of cluster participants purposes.…”
Section: Suppliermentioning
confidence: 99%