2015
DOI: 10.1109/tsg.2015.2394495
|View full text |Cite
|
Sign up to set email alerts
|

A Practical and Open Source Implementation of IEC 61850-7-2 for IED Monitoring Applications

Abstract: A new open source mapping of IEC 61850-7-2 to web services has been defined and implemented. This work is useful for rapidly implementing user interfaces-particularly web-based interfaces-for monitoring and controlling Intelligent Electronic Devices (IEDs) from multiple vendors. The web service mapping has been implemented using the Hypertext Transfer Protocol (HTTP), with a message format in JavaScript Object Notation (JSON). This approach requires a simple and ubiquitous software stack for its implementation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
2
2
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 5 publications
0
4
0
Order By: Relevance
“…In particular, the proposed IED-OLP formulation minimizes the AV20 index, i.e., a parameter establishing the economic penalty suffered by the energy supplier, as a result of the inefficiency caused to costumers due to a fault in the network. The proposed approach has been tested using a real radial network, constituted of 41 nodes, considering different customer distributions and varying the number of IEDs to be installed within the range (2)(3)(4)(5)(6)(7)(8).…”
Section: Discussionmentioning
confidence: 99%
See 3 more Smart Citations
“…In particular, the proposed IED-OLP formulation minimizes the AV20 index, i.e., a parameter establishing the economic penalty suffered by the energy supplier, as a result of the inefficiency caused to costumers due to a fault in the network. The proposed approach has been tested using a real radial network, constituted of 41 nodes, considering different customer distributions and varying the number of IEDs to be installed within the range (2)(3)(4)(5)(6)(7)(8).…”
Section: Discussionmentioning
confidence: 99%
“…They allow a fail f can be isolated by a couple (i, j) only if both nodes of the couple are active. Constraint (6) fixes the number of IEDs to be installed. Finally, constraints ( 7) and ( 8) fix the domain of the decision variables.…”
Section: On This Basis the Ied-olp Can Be Modeled As Followsmentioning
confidence: 99%
See 2 more Smart Citations