2021
DOI: 10.1108/ijqrm-07-2020-0221
|View full text |Cite
|
Sign up to set email alerts
|

A renewal process model with failure based PM and imperfect CM for unavailability exploration

Abstract: PurposeThe paper aims to explore unavailability of dormant systems that are under both preventive and corrective maintenance. Preventive maintenance is considered as a failure based maintenance model, where full renew is realized at the occurrence of every nth failure. It proposes the imperfect corrective maintenance model, where each restoration process deteriorates the system lifetime, probability distribution of which is gradually changed via increasing failure rate.Design/methodology/approachBasic reliabil… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 28 publications
0
2
0
Order By: Relevance
“…The corresponding reliability mathematics for the unavailability quantification of terminal nodes was derived in this article because this unavailability is used as the main input in system unavailability quantification using AGs as the system representation. Although the renewal process model that originates from the new renewal cycle was only developed in this article, in general, we can conclude that it is a limited case of the model developed in [31] where the length of the inspection period approaches zero. A cost model respecting the imperfect CM process with FBM was further introduced because it is indispensable for discrete maintenance optimization.…”
Section: Discussionmentioning
confidence: 87%
See 1 more Smart Citation
“…The corresponding reliability mathematics for the unavailability quantification of terminal nodes was derived in this article because this unavailability is used as the main input in system unavailability quantification using AGs as the system representation. Although the renewal process model that originates from the new renewal cycle was only developed in this article, in general, we can conclude that it is a limited case of the model developed in [31] where the length of the inspection period approaches zero. A cost model respecting the imperfect CM process with FBM was further introduced because it is indispensable for discrete maintenance optimization.…”
Section: Discussionmentioning
confidence: 87%
“…The starting point for the development of this methodology lies in our previous work introduced in [31], where dormant systems under inspection were investigated. The main difference is in the renewal cycle.…”
Section: 𝐸𝑇 = 𝐸𝑋 + 𝐸𝑌mentioning
confidence: 99%