2022
DOI: 10.1016/j.seta.2021.101704
|View full text |Cite
|
Sign up to set email alerts
|

A review on operation and maintenance of hydropower plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
23
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 42 publications
(23 citation statements)
references
References 100 publications
0
23
0
Order By: Relevance
“…They claimed that maintenance costs should be prioritized to become successful for levelized energy costs. Moreover, Kumar and Saini [24] also focused on the performance indicators of hydropower plants. It is identified that operational costs should be evaluated carefully for this condition.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…They claimed that maintenance costs should be prioritized to become successful for levelized energy costs. Moreover, Kumar and Saini [24] also focused on the performance indicators of hydropower plants. It is identified that operational costs should be evaluated carefully for this condition.…”
Section: Literature Reviewmentioning
confidence: 99%
“…On the other side, potential loss of capacity for generated electricity plays a significant role as for the capacity loss. Additionally, energy loss also leads to higher levelized energy costs [2]. Deviation of expected service life of the energy plants is quite important for the management of the levelized energy costs.…”
Section: Introductionmentioning
confidence: 99%
“…This paper assumes that all ICs will occur in year zero. Table 4 shows the key technological and economic assumptions made in the calculations that reproduce the current state of the country's hydropower industry [31][32][33]. The reliability assessment in generation systems is very important [34,35], and since this study considers the overall life cycle cost of SHP, the reliability aspects are considered in the form of the annual plant load factor, rehabilitation times and replacement costs.…”
Section: Lcoe Calculationsmentioning
confidence: 99%
“…In the age of increasing conventional fuels price and the paradigm of de-carbonization aiming to fight climate changes [1], the technologies that convert energy from renewable sources gain an increasingly justified importance. Of these the hydropower plants occupy a significant segment providing 19% of worldwide electricity [2], while also being one of the most efficient [3].…”
Section: Introductionmentioning
confidence: 99%