“…In fact, maybe the generation cost in other areas is cheaper than the assigned area, so, it is economical to receive electrical power from cheaper areas. Therefore, the net transmitted power must be between values such as L, K determined by (33) and (34) (see (33)) (see (34)) iii. Identify the proper tie-line amount.…”