2017
DOI: 10.1541/ieejpes.137.687
|View full text |Cite
|
Sign up to set email alerts
|

A Scheduling Operation Method of Wind Farm to Deal with Ramp Events and Evaluation of Required Battery Capacity

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2018
2018
2019
2019

Publication Types

Select...
4
1

Relationship

2
3

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 12 publications
0
7
0
Order By: Relevance
“…The number of scenarios is set to M = 1000 from the standpoints of solution convergence and computing cost; the upper limit of interframe variation is set to ΔP lim = 0.05 with reference to previous research. 20 According to literature, 19 SA/SW seasonality is observed in Tohoku and Hokkaido regions. Thus we calculated forecast errors from respective actual/forecast data, and created a scatter plot as shown in Figure 9.…”
Section: Conditionsmentioning
confidence: 99%
See 2 more Smart Citations
“…The number of scenarios is set to M = 1000 from the standpoints of solution convergence and computing cost; the upper limit of interframe variation is set to ΔP lim = 0.05 with reference to previous research. 20 According to literature, 19 SA/SW seasonality is observed in Tohoku and Hokkaido regions. Thus we calculated forecast errors from respective actual/forecast data, and created a scatter plot as shown in Figure 9.…”
Section: Conditionsmentioning
confidence: 99%
“…As regards absolute values, linearization of max/min function and other details, please refer to literature. 20 WF output is unknown at the stage of generation scheduling, and therefore, WF output forecast is used instead. In so doing, generation schedules are designed so as to manage SOC (State Of Charge) of battery storage, while minimizing the risks of demandsupply mismatch resulting from forecast errors.…”
Section: Proposed Generation Scheduling Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…The authors have participated in a project commissioned by the New Energy and Industrial Technology Development Organization (NEDO). In this project, Takayama et al and Yoshida et al developed scheduling methods or control methods with a battery ESS [12,13]. Hamamoto et al investigated a heat pomp and biogas engine generator [14].…”
Section: Introductionmentioning
confidence: 99%
“…In our previous research, we investigated scheduled operation of WF to handle ramp events. Thus we proposed a deterministic programming (DP) method in which forecast data of WF output were treated as definite values.…”
Section: Introductionmentioning
confidence: 99%