2015 Winter Simulation Conference (WSC) 2015
DOI: 10.1109/wsc.2015.7408337
|View full text |Cite
|
Sign up to set email alerts
|

A simulation analysis of the vehicle axle and spring assembly lines

Abstract: A discrete event simulation model was developed to represent the current vehicle axle and spring assembly lines and understand their dynamics for an automotive company in need of production increase to accommodate expected demand growth. The aim of this study is to provide viable manufacturing plans to improve productivity, and we propose several alternative system component changes to reach the desired throughput level as well as determine the corresponding optimal system configurations. Sensitivity analyses … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0
2

Year Published

2018
2018
2022
2022

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 7 publications
0
1
0
2
Order By: Relevance
“…El modelo que se realiza se debe verificar, pues éste debe evidenciar que aspectos como el funcionamiento, resultados y relaciones entre variables reflejen la lógica del sistema y se aproximen a la realidad [19,20,21]. Para esto se realizaron las siguientes pruebas:…”
Section: Resultados Verificación Del Modelounclassified
“…El modelo que se realiza se debe verificar, pues éste debe evidenciar que aspectos como el funcionamiento, resultados y relaciones entre variables reflejen la lógica del sistema y se aproximen a la realidad [19,20,21]. Para esto se realizaron las siguientes pruebas:…”
Section: Resultados Verificación Del Modelounclassified
“…Bae vd. [33] tarafından gerçekleştirilen çalışmada montaj hattındaki üretkenliği arttırmak amacı ile simülasyon kullanılarak, hattaki çıktıyı etkileyen en önemli senaryo belirlenmiştir. Akin [34] tarafından gerçekleştirilen çalışmada, simülasyondan yararlanılarak hat dengeleme sonucunda oluşturulan yeni yerleşim düzeninin üretim miktarı üzerinde etkisini göstermek amaçlanmıştır.…”
Section: Kaynak Araştirmasi (Literatureunclassified
“…In jewelry production, Supsomboon (2019) proposed a simulation model to be done in order to reduce bottlenecks and improve productivity level by using line balancing. Bae et al (2015) implemented discrete event simulation model to propose alternative systems for vehicle axle and spring assembly lines to increase the productivity as well as accommodate the increasing demand. There were three different factors that need to be focus on; Arrival rate, Batch size and Operator resource and utilized them to create different scenarios which each of them varied at the same time in order to find the best possible settings.…”
Section: Literature Reviewmentioning
confidence: 99%