A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries

Abstract: Delays in road construction projects due to various reasons are a major problem facing construction professionals. The incapability of finishing projects punctually and within a given budget is a persistent issue worldwide. This study aims to determine the ten principal causes of delay in road construction projects in 25 developing countries across the globe. The study involves two steps. First, the authors compiled information regarding the most frequent delays in a road construction project. Second, they ana… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 38 publications
(29 citation statements)
references
References 19 publications
0
13
0
1
Order By: Relevance
“…Care was taken to incorporate most of the key factors under the consultant-and design-linked aspects in the questionnaire, as found in the literature reviewed (Table 1) (Aibinu and Odeyinka, 2006;Al-Kharashi and Skitmore, 2009;Bagrecha and Bais, 2017;Doloi, et al, 2012;KPMG and PMI, 2012;Love, et al, 2011;Mäki, 2015;Mali and Warudkar, 2016;Pandya and Malek, 2018;Rivera, Baguec, and Yeom, 2020;Singh, 2010). The questionnaires were reviewed and finalised after initial discussions with some of the stakeholders (A sample questionnaire has been included in Appendix-1).…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…Care was taken to incorporate most of the key factors under the consultant-and design-linked aspects in the questionnaire, as found in the literature reviewed (Table 1) (Aibinu and Odeyinka, 2006;Al-Kharashi and Skitmore, 2009;Bagrecha and Bais, 2017;Doloi, et al, 2012;KPMG and PMI, 2012;Love, et al, 2011;Mäki, 2015;Mali and Warudkar, 2016;Pandya and Malek, 2018;Rivera, Baguec, and Yeom, 2020;Singh, 2010). The questionnaires were reviewed and finalised after initial discussions with some of the stakeholders (A sample questionnaire has been included in Appendix-1).…”
Section: Methodsmentioning
confidence: 99%
“…However, delays in building construction projects are attributed to the three traditional project actors, being the clients, the contractors, and the consultants engaged in planning and design activities (Aiyetan and Das, 2016;Das, 2015;Han, Love and Pena-Mora, 2013;Love, et al, 2011). In India, the factors related to these three stakeholders are also predominant causes of delay in the construction industry (Das, 2015;Das, 2018;Bagrecha and Bais, 2017;Deep, et al, 2018;Doloi, et al, 2012;Mali and Warudkar, 2016;Pandya and Malek, 2018;Rivera, Baguec and Yeom, 2020;Singh, Bala and Dixit, 2018).…”
Section: Delays In Construction Projectsmentioning
confidence: 99%
See 2 more Smart Citations
“…The delay issue exists in most road construction projects [1]. The Oxford English Dictionary defines delay as "a period of time when someone or something has to wait because of a problem that makes something slow or late" [2].…”
Section: Introductionmentioning
confidence: 99%