“…The benefits of infusing technology into construction, have been extensively discussed in literature: Yang et al (2007), Succar (2009), grilo and Jardim-goncalves (2010), Singh, gu andWang (2011), Becerik-gerber, Ku andJazizadeh (2012), Porwal and hewage (2013), Nassar and AbouRizk (2014) and Ahn, Kwak and Suk (2015) for construction generally and Cheng and Teizer (2013), Kim et al (2013) and Lin et al (2014) for CSM. however, CSM still suffers from capacity strain and process challenges, which may be alleviated through the infusion of technology, as substantiated in extant literature suggesting areas of intervention.…”