A Value Analysis of Lean Processes in Target Value Design and Integrated Project Delivery

Abstract: While lean tools and an IPD method are preferred to traditional design-bid-build methods, the perception of different stakeholders varies and more work needs to be done to allow a truly shared decision-making model. Learning was identified as one of the biggest advantages.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
15
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(16 citation statements)
references
References 9 publications
1
15
0
Order By: Relevance
“…The proper focus on the value added to patients and the well-being improvements among hospital workers, created by a well-designed sustainable continuous improvement system, would certainly represent an enormous contribution to society. (Clark, Moller, & O'Brien, 2014) CS A10 N/A I3;I4 N/A (Colldén, Gremyr, Hellström, & Sporraeus, 2017) CS A17 N/A N/A N/A (Costa, Filho, Rentes, Bertani, & Mardegan, 2017) (Hwang, Hwang, & Hong, 2014) CS A2;A6;A17 T42; T29; T28; T20 N/A N/A (Improta et al, 2018) AR A1 T41;T30; T27; T1; T8 I1;I3 N/A (Lot et al, 2018) AR A4 T41; T29; T13; T4; T31; T30 I2;I3;I5 N/A (Mannon, 2014) CS A2;A3; T29; T27; T13 I1 N/A (Matt, Rauch, & Franzellin, 2015) AR A2 N/A I2;I3;I5 D3 (Mehdi & Al Bahrani, 2017) CS A11 T39; T8; T17 I1;I2;I3;I4 N/A (Miller & Chalapati, 2015) CS A4 T41; T30 I3 D1;D3 (Nanda, Rybkowski, Pati, & Nejati, 2017) CS A3 T31; T22 N/A N/A (Narayanamurthy, Gurumurthy, & Lankayil, 2018) CS A4;A14 T33; T2; T32; T49; T10 N/A N/A (Nayar, Ojha, Fetrick, & Nguyen, 2016) AR A2 T12; T44; T36 I3;I4 D5 (P. Simons et al, 2017) CS A11 T41;T30; T22; T17 N/A N/A (Pineda Dávila & Tinoco González, 2015) AR A7 T30; T4; T42 I1;I2;I4;I5 N/A (Poksinska, Fialkowska-Filipek, & Engström, 2017) (Fournier & Jobin, 2018) CS…”
Section: Discussion Recommendations and Conclusionmentioning
confidence: 99%
“…The proper focus on the value added to patients and the well-being improvements among hospital workers, created by a well-designed sustainable continuous improvement system, would certainly represent an enormous contribution to society. (Clark, Moller, & O'Brien, 2014) CS A10 N/A I3;I4 N/A (Colldén, Gremyr, Hellström, & Sporraeus, 2017) CS A17 N/A N/A N/A (Costa, Filho, Rentes, Bertani, & Mardegan, 2017) (Hwang, Hwang, & Hong, 2014) CS A2;A6;A17 T42; T29; T28; T20 N/A N/A (Improta et al, 2018) AR A1 T41;T30; T27; T1; T8 I1;I3 N/A (Lot et al, 2018) AR A4 T41; T29; T13; T4; T31; T30 I2;I3;I5 N/A (Mannon, 2014) CS A2;A3; T29; T27; T13 I1 N/A (Matt, Rauch, & Franzellin, 2015) AR A2 N/A I2;I3;I5 D3 (Mehdi & Al Bahrani, 2017) CS A11 T39; T8; T17 I1;I2;I3;I4 N/A (Miller & Chalapati, 2015) CS A4 T41; T30 I3 D1;D3 (Nanda, Rybkowski, Pati, & Nejati, 2017) CS A3 T31; T22 N/A N/A (Narayanamurthy, Gurumurthy, & Lankayil, 2018) CS A4;A14 T33; T2; T32; T49; T10 N/A N/A (Nayar, Ojha, Fetrick, & Nguyen, 2016) AR A2 T12; T44; T36 I3;I4 D5 (P. Simons et al, 2017) CS A11 T41;T30; T22; T17 N/A N/A (Pineda Dávila & Tinoco González, 2015) AR A7 T30; T4; T42 I1;I2;I4;I5 N/A (Poksinska, Fialkowska-Filipek, & Engström, 2017) (Fournier & Jobin, 2018) CS…”
Section: Discussion Recommendations and Conclusionmentioning
confidence: 99%
“…Nida et al (2015) stated that significant barriers are rooted in the way public owners perceive IPD. Nanda et al (2017) investigated what key stakeholders considered to be the pros & cons for improvement in using lean thinking and tools in an IPD process. Zhang et al (2012) studied the flexibility of integrated project teams, and how to build partnership and social dimensions.…”
Section: Integrated Project Deliverymentioning
confidence: 99%
“…Second, TVD turns the current design practice upside down because the designers have to (1) design based on a detailed estimate; (2) design for what is constructible; (3) work together to define the issues and produce decisions; and then design to those decisions. Finally, in TVD, solution sets are kept throughout the design process; work is carried out in pairs or a larger face-to-face group [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…The TVD approach enables a project environment with favorable characteristics for generating value, including an emphasis on design activities, making the customer an essential participant in the process, and enhancing the customer-supplier relationship through collaborative approaches [4,5]. However, the primary measurement performed in TVD is not focused on value but TC [6,7].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation