2019
DOI: 10.1016/j.promfg.2020.01.290
|View full text |Cite
|
Sign up to set email alerts
|

A Weighted Multi-Objective Mathematical Model for Cell Scheduling and Environmentally Sustainable Supply Chain Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 10 publications
0
3
0
Order By: Relevance
“…For example, scholars Tanimizu and Amano [62] proposed a new comprehensive scheduling method for production and transportation problems based on the green supply chain network model to reduce carbon dioxide emissions. Scholar Sinaki et al [63] proposed a multi-objective programming model, which is used to integrate production scheduling and environmentally sustainable supply chain networks to obtain optimal satisfaction.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For example, scholars Tanimizu and Amano [62] proposed a new comprehensive scheduling method for production and transportation problems based on the green supply chain network model to reduce carbon dioxide emissions. Scholar Sinaki et al [63] proposed a multi-objective programming model, which is used to integrate production scheduling and environmentally sustainable supply chain networks to obtain optimal satisfaction.…”
Section: Literature Reviewmentioning
confidence: 99%
“…e investment reduces the carbons emitted per replenishment and per unit produced. Sinaki et al [12] presented a weighted multiobjective mixed-integer-nonlinear programming model to 2…”
Section: Literature Reviewmentioning
confidence: 99%
“…Cell scheduling is one of the most important management problems in the cellular manufacturing system, and has received extensive attentions and investigations. For example, Feng et al [2] establish a mixed integer programming model for cell scheduling and use a genetic algorithm to solve it, while Sinaki et al [3] solve the established weighted multi-objective cell scheduling model with Lingo. For a long time, research on cell manufacturing systems has usually focused on the performance indicators related to efficiency and output.…”
Section: Introductionmentioning
confidence: 99%