2020
DOI: 10.1016/j.jclepro.2020.123167
|View full text |Cite
|
Sign up to set email alerts
|

Accurate capacity factor calculation of waste-to-energy power plants based on availability analysis and design/off-design performance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 35 publications
(7 citation statements)
references
References 23 publications
0
7
0
Order By: Relevance
“…In all the analysed cases, simulations have the advantage of being able to apply the anticipatory failure investigation in eco-design, allowing the estimation of the impacts of a product at the design or prototype stage but which has not yet been manufactured and marketed. Furthermore, in this context, compared to other more manual approaches such as Design-FMEA, simulations can characterize failures in a considerably more complete, precise and reliable way, although mostly limited to structural failures during operation or manufacturing (Naderi et al, 2020).…”
Section: Simulationsmentioning
confidence: 99%
See 1 more Smart Citation
“…In all the analysed cases, simulations have the advantage of being able to apply the anticipatory failure investigation in eco-design, allowing the estimation of the impacts of a product at the design or prototype stage but which has not yet been manufactured and marketed. Furthermore, in this context, compared to other more manual approaches such as Design-FMEA, simulations can characterize failures in a considerably more complete, precise and reliable way, although mostly limited to structural failures during operation or manufacturing (Naderi et al, 2020).…”
Section: Simulationsmentioning
confidence: 99%
“…The consideration of the failures during the ecoassessment is also useful to improve the reliability of the same analysis, avoiding simplistic assumptions that sometimes one is forced to make or to rely too much on product category rule (PCR) parameters that are not as representative as well as an accurate and ad hoc investigation of the single product (Naderi et al, 2020). In addition, the analysis of product failures and their related risks, during the eco-assessment, can also benefit decision-making about the eco-improvement choices (Matthews et al, 2002).…”
Section: Introductionmentioning
confidence: 99%
“…The availability factors presented below are global values, with the exception of conventional nuclear power, which shows a historical value for India. Open cycle gas-red power plant 0.92 [59] Combined cycle gas-red power plant 0.92 [59] Diesel generator 0.92 [60] Nuclear power plant 0.95 [61] Pumped storage hydropower plant 0.98 [62] Small hydropower plant (SHP) 0.98 [62] Biomass cogeneration power plant 0.93 [63] Geothermal 0.9 [64] Waste to Energy 0.62 [65]…”
Section: Miscellaneous Datamentioning
confidence: 99%
“…Reserve margin, the ratio of the difference between available capacity and peak demand to peak demand, is regularly reviewed in some markets such as PJM, NYSO, and ERCOT, and usually a level of 16% is targeted (PJM, 2019). The markets in North America usually target reference cases between 15 and 20% while some markets reach 30% reserve margin (NERC, 2019).…”
Section: Reserve Margin and Capacity Marginmentioning
confidence: 99%