Accurate Vertical Pile Installation by Using a Hydraulic Vibratory Hammer on the Arbroath Project

Abstract: In the SUImller of 1989 the Arbroath platform was installed on behalf of Amoco in the UK Sector of the North Sea. A part of the project involved the installation of two docking piles, for locating the platform accurately over the template, and four under-leg piles for giving initial stability to the platform, before the skirt piles had been driven.The paper describes the use of a vibratory hammer, the ICE-14l2, during the installation of the docking and under-leg piles. It describes how the penetration by vibr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2000
2000
2022
2022

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Another example of successful use of vibratory driving was installation of piles for Amoco Arbroath platform in the UK sector of the North Sea (Ligtering 1990). Piles with a diameter of 1,067 mm were installed to a depth about 25 m using an ICE-1412 vibratory driver.…”
Section: A3mentioning
confidence: 99%
“…Another example of successful use of vibratory driving was installation of piles for Amoco Arbroath platform in the UK sector of the North Sea (Ligtering 1990). Piles with a diameter of 1,067 mm were installed to a depth about 25 m using an ICE-1412 vibratory driver.…”
Section: A3mentioning
confidence: 99%