2021
DOI: 10.3390/en14144361
|View full text |Cite
|
Sign up to set email alerts
|

Active Distribution Networks Planning Considering Multi-DG Configurations and Contingency Analysis

Abstract: This paper proposes a novel method for planning active distribution networks (ADNs) with the integration of an active network management (ANM) scheme using coordinated voltage control (CVC) through on-load tap changer (OLTC) transformers. The method was formulated as a security-constrained optimal power flow (SCOPF) problem to minimize total operational costs, which maximizes the utilization of renewable distributed generators (DGs) over a planning horizon. The ANM scheme was applied using OLTC to ensure safe … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 29 publications
0
3
0
1
Order By: Relevance
“…On the other hand, traditional mathematical programming methods such as Branch and Bound, Branch and Cut, Cutting plane method can guarantee the optimality of the model solutions. However, as the problem size increases, the solution time increases exponentially [11][12][13][14].…”
Section: Literature Reviewmentioning
confidence: 99%
“…On the other hand, traditional mathematical programming methods such as Branch and Bound, Branch and Cut, Cutting plane method can guarantee the optimality of the model solutions. However, as the problem size increases, the solution time increases exponentially [11][12][13][14].…”
Section: Literature Reviewmentioning
confidence: 99%
“…The second type of research is based on investment optimization models and obtaining solutions using related improvement methods [4], such as particle swarm optimization [5] and envelope analysis method [6] to obtain optimal ranking results according to different objective functions and boundary conditions. Dušan Božič et al [7] calculated the improvement range of active power loss and other indicators of the project planning scheme and analysed respectively based on the overall investment maximization and the highest score of a single project.…”
Section: Introductionmentioning
confidence: 99%
“…With the rapidly growing penetration of renewable energy sources and the everincreasing complexity of electrical systems, transmission lines are becoming overloaded and experiencing reduced stability, increased voltage variation, and loop-flow of power. This fact is even more pronounced in large-scale power systems [1][2][3][4]. The demands for better utilization of existing power systems and to increase power transfer capability by installing flexible AC transmission system (FACTS) devices have become increasingly urgent.…”
Section: Introductionmentioning
confidence: 99%