2015
DOI: 10.1007/978-3-319-22867-9_13
|View full text |Cite
|
Sign up to set email alerts
|

Agent-Based Production Scheduling for Aircraft Manufacturing Ramp-up

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 21 publications
0
2
0
Order By: Relevance
“…Vrba et al (2015) 37 introduce a scheduling model implemented using agents for the ramp-up of aircraft manufacturing. The proposal relies on mathematical modelling and the resulting model is integrated within an overall Information Technology (IT) architecture.…”
Section: Mas Applications In Ramp-up Managementmentioning
confidence: 99%
“…Vrba et al (2015) 37 introduce a scheduling model implemented using agents for the ramp-up of aircraft manufacturing. The proposal relies on mathematical modelling and the resulting model is integrated within an overall Information Technology (IT) architecture.…”
Section: Mas Applications In Ramp-up Managementmentioning
confidence: 99%
“…The work (Vrba et al, 2015) describes the Airbus A350 assembly line organized as a sequence of several assembly stations. A solution is presented for scheduling the aircraft production during the ramp-up phase.…”
Section: P Pawlewskia and K Kluskamentioning
confidence: 99%