2021
DOI: 10.1016/j.cie.2021.107225
|View full text |Cite
|
Sign up to set email alerts
|

An Adapted Variable Neighborhood Search based algorithm for the cyclic multi-hoist design and scheduling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 45 publications
0
1
0
Order By: Relevance
“…In industrial applications, scheduling problems that pose computational challenges are widespread [9]. Some examples of such problems are staff rostering [10], hoist scheduling [11], satellite scheduling [12], etc. Regarding hydrogen production, [13] proposed a control strategy for the sequential operation of multiple PEM electrolysers, depending on the availability of photovoltaic power.…”
Section: Introductionmentioning
confidence: 99%
“…In industrial applications, scheduling problems that pose computational challenges are widespread [9]. Some examples of such problems are staff rostering [10], hoist scheduling [11], satellite scheduling [12], etc. Regarding hydrogen production, [13] proposed a control strategy for the sequential operation of multiple PEM electrolysers, depending on the availability of photovoltaic power.…”
Section: Introductionmentioning
confidence: 99%