2010
DOI: 10.1007/978-3-642-15597-0_17
|View full text |Cite
|
Sign up to set email alerts
|

An Artificial Bee Colony with Random Key for Resource-Constrained Project Scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 17 publications
(1 citation statement)
references
References 20 publications
0
1
0
Order By: Relevance
“…Moreover, the method uses SSGS to generate the feasible schedules (Akbari, Zeighami, & Ziarati, 2010). The proposed ABC algorithm uses a random number to select one of the two SGS methods, which is directly used to generate schedules (Shi, Qu, Chen, & Li, 2010). A bee algorithm introduced a new formula to evaluate the quality of the solutions found in the search space (Sadeghi, Kalanaki, Noktehdan, Samghabadi, & Barzinpour, 2011).…”
Section: Bees Colony Optimization (Bco) and Rcpspmentioning
confidence: 99%
“…Moreover, the method uses SSGS to generate the feasible schedules (Akbari, Zeighami, & Ziarati, 2010). The proposed ABC algorithm uses a random number to select one of the two SGS methods, which is directly used to generate schedules (Shi, Qu, Chen, & Li, 2010). A bee algorithm introduced a new formula to evaluate the quality of the solutions found in the search space (Sadeghi, Kalanaki, Noktehdan, Samghabadi, & Barzinpour, 2011).…”
Section: Bees Colony Optimization (Bco) and Rcpspmentioning
confidence: 99%