An assessment of the algorithm difference measure in a multivariate system for production plans scheduling

Abstract: In the process of designing a production plan, one of the important steps is scheduling the execution of technological operations. The schedule can be created either manually or by using software. If the schedule is compiled by software, then several schedule generation algorithms are used to eliminate possible errors. A set of such algorithms is called a "batch". It is advisable that only different algorithms should be included in the batch. This is necessary to eliminate errors of the same type. Therefore, t… Show more