2013
DOI: 10.1016/j.jclepro.2013.02.005
|View full text |Cite
|
Sign up to set email alerts
|

An Environmental Impact Causal Model for improving the environmental performance of construction processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
42
0
5

Year Published

2014
2014
2024
2024

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 68 publications
(47 citation statements)
references
References 38 publications
0
42
0
5
Order By: Relevance
“…After the expansion of the construction sector, the Spanish government passed Royal Decree 105/2008 (Spain, 2008a) to regulate for the first time C&D waste production and management in Spain. Subsequently, most of the autonomous communities adapted the rulings of Royal Decree 105/2008 (Spain, 2008a) to the their context (Andalucía, 2012;Aragón, 2009;Basque Country, 2012;Cantabria, 2010;Catalonia, 2010;Extremadura, 2011;Galicia, 2009;Madrid, 2009;Navarra, 2011) and thus, current legal framework on C&D waste management does not show substantial differences amongst the Spanish regions. In Catalonia and according to Decree 89/2010(Catalonia, 2010, the project developer (or waste producer) must include a C&D waste management study in the construction project and the contractor (waste owner) must draw up a C&D waste management plan for the construction site (Figure 1).…”
Section: Legal Frameworkmentioning
confidence: 99%
“…After the expansion of the construction sector, the Spanish government passed Royal Decree 105/2008 (Spain, 2008a) to regulate for the first time C&D waste production and management in Spain. Subsequently, most of the autonomous communities adapted the rulings of Royal Decree 105/2008 (Spain, 2008a) to the their context (Andalucía, 2012;Aragón, 2009;Basque Country, 2012;Cantabria, 2010;Catalonia, 2010;Extremadura, 2011;Galicia, 2009;Madrid, 2009;Navarra, 2011) and thus, current legal framework on C&D waste management does not show substantial differences amongst the Spanish regions. In Catalonia and according to Decree 89/2010(Catalonia, 2010, the project developer (or waste producer) must include a C&D waste management study in the construction project and the contractor (waste owner) must draw up a C&D waste management plan for the construction site (Figure 1).…”
Section: Legal Frameworkmentioning
confidence: 99%
“…Indeed, main construction companies are slowly considering environmental issues by implementing Environmental Management Systems (EMS) (Fuertes et al, 2013), not limiting their action to the current legislation, and seeking the implementation of good environmental practices in their works (Qi et al, 2011;Tsai et al, 2013). However, while this fact is a reality for large construction companies, the vast majority of construction companies (small and medium size enterprises) still need to accept this new situation .…”
Section: Introductionmentioning
confidence: 99%
“…Kurum bünyesinde geliştirilmiş çevresel performans ile ilgili misyon veya değer beyanları, davranış kuralları ve bunlara dair uygulamaların durumu [45,55] Sürdürülebilirliğe duyarlı yönetim anlayışı ve stratejilerin uygulanması [56,63,64] Firmanın çevre yönetim planının bulunması ve uygulanma durumu [65,66] ISO 14001 Çevre Yönetim Sistemi Belgesine sahip olma ve sertifikanın işlerliği [66,67,68] ISO 14001 veya denk çevresel yönetim sistemi sertifikasına sahip firmalardan alınan servislerin tüm hizmet alımları içindeki yüzdesi [69] Çevresel performans ölçümü ve değerlendirme sistemlerinin uygulanması [63,66,70,71] Çevresel koruma programları aktiviteler ve yatırımlar için yapılan harcamalar [36,72,73] Çevre ile ilgili sigorta harcamaları [45,74] Çevresel hedeflerin başarılma oranı [69] Sürdürülebilirlik uygulama planı geliştiren şantiye sayısı [66,69] Mevzuat ve yasal düzenlemelere uyumluluk oranı [36,73] Mevzuat ve yasal düzenlemelere uymamak yüzünden kesilen cezalar [45,66,73,75] Altyapıya verilen zarar sebebiyle kesilen cezalar [76] Zararlı madde kullanımı sebebiyle kesilen cezalar [76] Firmaya çevresel suçlardan dolayı açılmış davalar [63,73,77] Rapor edilmiş çevresel olaylar Meydana gelen çevresel kazalara ve olaylara müdahale süresi [10,45,78] [73]…”
Section: çEvresel Performans Göstergeleri Kaynaklar Yönetimunclassified
“…Şantiye sahalarında ekolojinin korunması için alınan önlemlerin maliyeti [10,68,70,86] Kesilmesi gereken ağaçlar için ağaç kurtarma planı yapılması ve uygulanması [84] Şantiye sahalarının çevresinin yeşillendirilmesi için harcanan tutar [84,86] Şantiye kaynaklı tozun kontrol altında tutulması için yapılan harcamalar [76,79,80] Yüksek desibelli işlemlerde gürültü kontrol önlemleri alınmasıyla ilgili yapılan harcamalar [76,79,80,84] Gürültü, kirlilik, toz vb. konulara çevreden alınan şikâyetler [45] Şantiye girişinde araç temizleyici bulunan şantiye sayısı [76,79,80] Titreşimlerin verdiği rahatsızlıkların önlenmesi için katlanılan maliyetler [76,86] Hava ve su kirlenmelerinin önlenmesi için katlanılan maliyetler [79,80,86] …”
Section: şAntiye Etkileriunclassified
See 1 more Smart Citation