In the construction industry, project time & project cost are given upmost priority. But since there are innumerable uncertainties involved in construction, delays in project completion are fairly common which lead to an increase in project's total cost. Thus project time crashing plays an important role in project management determining which activities duration to crash to complete the project in the stipulated time. But crashing the duration will mean adding more resources which will lead to an increased additional cost of the project. Thus, the paper deals with determining how to crash the project duration so as to complete the project at the earliest with minimum added cost obtaining a Time-Cost Tradeoff for the project. This paper provides a framework for reducing total project time at the least added total cost by crashing the duration of an actual residential building construction project. The project is scheduled in Microsoft Project and crashed using the Solver add-in of Microsoft Excel. I. B. Problem Statement: Kolte-Patil Developers Ltd is a leading Pune-based real estate company. The company has developed and constructed 42 projects including 30 residential complexes, 8 commercial complexes, and 4 information technology parks across Pune and Bengaluru. The Township of Life Republic is an ongoing project by Kolte Patil Developers which commenced in 2010. The total cost of the whole project is estimated to be 11,000 crores. The scope of work for the whole project is large and complex since the vast 400 acre of township area is planned to be developed into several sectors containing Infrastructural Projects, Residential Projects, Commercial, Retail, Entertainment & Recreational, Educational, Sports, Health Sectors, Urban Farm, Management & Maintenance Projects. A residential tower "A" in the residential sector "R3" of the township has been chosen for the analysis of Time-Cost Tradeoff.