2020 Chinese Automation Congress (CAC) 2020
DOI: 10.1109/cac51589.2020.9327177
|View full text |Cite
|
Sign up to set email alerts
|

An integrated optimization approach of high-speed railway line plan to network load-balancing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(6 citation statements)
references
References 13 publications
0
6
0
Order By: Relevance
“…For the scope of these studies, some studies focused on a railway line and some studies As mentioned above, train 2 and train 5 share the same train sets. If train 2 is delayed for a short period of time, considering the rest turnback time is enough to finish necessary operations, train 5 will not be influenced by the delay, as shown in Figure 3. But if train 2 is delayed for a long period of time, considering the rest of the connecting time is not enough to finish necessary operations, the operator will have to dispatch a standby train set to undertake the operation plan of train 5 , or train 5 will also be delayed.…”
Section: Literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…For the scope of these studies, some studies focused on a railway line and some studies As mentioned above, train 2 and train 5 share the same train sets. If train 2 is delayed for a short period of time, considering the rest turnback time is enough to finish necessary operations, train 5 will not be influenced by the delay, as shown in Figure 3. But if train 2 is delayed for a long period of time, considering the rest of the connecting time is not enough to finish necessary operations, the operator will have to dispatch a standby train set to undertake the operation plan of train 5 , or train 5 will also be delayed.…”
Section: Literature Reviewmentioning
confidence: 99%
“…If train 2 is delayed for a short period of time, considering the rest turnback time is enough to finish necessary operations, train 5 will not be influenced by the delay, as shown in Figure 3. But if train 2 is delayed for a long period of time, considering the rest of the connecting time is not enough to finish necessary operations, the operator will have to dispatch a standby train set to undertake the operation plan of train 5 , or train 5 will also be delayed. So, we can see that the train timetable and train set circulation plan are closely related to the rescheduling problems, and it is necessary to reschedule these two aspects together.…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations