2018 IEEE Power &Amp; Energy Society General Meeting (PESGM) 2018
DOI: 10.1109/pesgm.2018.8585913
|View full text |Cite
|
Sign up to set email alerts
|

An On-line Generator Start-up Strategy Based on Deep Learning and Tree Search

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 12 publications
0
4
0
Order By: Relevance
“…There are three stages of transmission network reconfiguration, that is, start‐up sequence of generating units, skeleton network, and optimizing the restoration paths 12 with the satisfaction of all restoration constraints 13 . The main objective of the start‐up sequence of generating units is to maximize the restored generation capacity 15,90 . The generator start‐up sequence plays a key role in the restoration strategy that determines the time consumed in power system restoration, 50 accelerating the system recovery 91 .…”
Section: Optimization Models and Methodologies For Transmission Netwomentioning
confidence: 99%
See 2 more Smart Citations
“…There are three stages of transmission network reconfiguration, that is, start‐up sequence of generating units, skeleton network, and optimizing the restoration paths 12 with the satisfaction of all restoration constraints 13 . The main objective of the start‐up sequence of generating units is to maximize the restored generation capacity 15,90 . The generator start‐up sequence plays a key role in the restoration strategy that determines the time consumed in power system restoration, 50 accelerating the system recovery 91 .…”
Section: Optimization Models and Methodologies For Transmission Netwomentioning
confidence: 99%
“…Optimization of network reconfiguration is divided into three stages such as a start‐up sequence of generating units, skeleton network, and optimizing the restoration paths 12 with the satisfaction of all restoration constraints 13 . The main objective of the start‐up sequence of generating units is to maximize the restored generation capacity 15,90 . It is the main phase of the network reconfiguration phase 11 .…”
Section: Optimization Models and Methodologies For Transmission Netwomentioning
confidence: 99%
See 1 more Smart Citation
“…Finally, the optimal primary action set obtained for the different initial degraded states (i.e., the network state following a blackout) will be used to train an artificial neural network that can be used in online application for fast determination of the restoration sequence. Similarly, [81] has employed Monte Carlo tree search approach to propose a decision-making strategy for generator start-up and line energization sequence.…”
Section: Optimization Of Generators Start-up Sequence and Restoration...mentioning
confidence: 99%