Abstract: Tower crane is the core construction facility in the high-rise building construction sites. Proper selection and location of construction tower cranes not only can affect the expenses but also it can have impact on the material handling process of building construction. Tower crane selection and layout problem (TCSLP) is a type of construction site layout problem, which is considered as an NP-hard problem. In consequence, researchers have extensively used metaheuristics for their solution. The Sine Cosine Algo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 25 publications
0
6
0
Order By: Relevance
“…The introduction of coefficient λ represents the simultaneity of the operator's operation of the hook in both radial and tangential directions. Therefore, the total travel time of the hook in the horizontal direction is shown in Formula (8). The value range of parameter λ is from zero to one, and the larger the parameter value, the higher the degree of simultaneous movement.…”
Section: Estimate Tower Crane Movement Time Between Two Locationsmentioning
confidence: 99%
See 2 more Smart Citations
“…The introduction of coefficient λ represents the simultaneity of the operator's operation of the hook in both radial and tangential directions. Therefore, the total travel time of the hook in the horizontal direction is shown in Formula (8). The value range of parameter λ is from zero to one, and the larger the parameter value, the higher the degree of simultaneous movement.…”
Section: Estimate Tower Crane Movement Time Between Two Locationsmentioning
confidence: 99%
“…Generally speaking, there are three main aspects that significantly affect the operational efficiency and safety of multiple tower cranes: (i) the selection and layout of multiple tower cranes on construction sites [6][7][8][9][10][11][12][13][14][15]; (ii) the improvement of path and motion scheduling [4,[16][17][18][19][20]; and (iii) the lifting schedule for each tower crane [5]. In the early stage of construction, it is necessary to choose a reasonable type of tower crane and carry out a reasonable layout of multiple tower cranes.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Material handling, which involves some short-distance movements, plays an crucial role in the construction and manufacturing activities [5]. The expenses and the time of the construction in the material handling system will be extremely affected if the location of facilities be located suitably in the site.…”
Section: Introductionmentioning
confidence: 99%
“…Having ample construction space is a necessity for any construction project, for it needed for a range of short-term facilities; well-functioning, and safe, construction movements. One of the main steps in planning the site is construction site-level facilities layout [5]. Organizing a set of work space in the construction site that can provide a level of safety and efficiency is not a simple task, but rather a multifaceted job to do, because it inevitably involves a lot of scenarios that should be taken into consideration.…”
Section: Introductionmentioning
confidence: 99%