2020
DOI: 10.1016/j.ijhydene.2020.05.267
|View full text |Cite
|
Sign up to set email alerts
|

Analysing the performance, fuel cost and emission parameters of the 50 MW simple and recuperative gas turbine cycles using natural gas and hydrogen as fuel

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
14
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 83 publications
(16 citation statements)
references
References 45 publications
2
14
0
Order By: Relevance
“…The study also showed a small performance improvement for a conventional aero engine; however, this is dependent on the fuel temperature and cycle configuration. The study also showed reduced emissions and an increase in NOx, in line with the works of Lee et al [25], Svensson et al [26], and Yildiz et al [27]. Exergy is another way to understand and compare the performance of LH 2 [28][29][30].…”
Section: System Descriptionsupporting
confidence: 86%
“…The study also showed a small performance improvement for a conventional aero engine; however, this is dependent on the fuel temperature and cycle configuration. The study also showed reduced emissions and an increase in NOx, in line with the works of Lee et al [25], Svensson et al [26], and Yildiz et al [27]. Exergy is another way to understand and compare the performance of LH 2 [28][29][30].…”
Section: System Descriptionsupporting
confidence: 86%
“…where C PEP , C OPM , and C SAL are respectively the costs for the initial purchase, for operating and maintaining the system, and for salvage (selling a part of useable materials and components at the end of the system's lifetime). These three items are obtained from Equations ( 4) to (6), respectively [1,38,39]:…”
Section: Cost Per Liter (Cpl)mentioning
confidence: 99%
“…For wind and PV generation, the O&M cost C OM,wind and C OM,pv could be described by 2% of their capital cost [4]. The O&M cost of GT could be described by 4% of its capital cost [5]. For ESS, the O&M cost is primarily related to its rated power.…”
Section: Cost Functionmentioning
confidence: 99%