Analysis of construction delay for delivering quality project in Bangladesh

Abstract: PurposeConstruction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.Design/methodology/approachAn extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of con… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 19 publications
(18 citation statements)
references
References 25 publications
0
7
0
Order By: Relevance
“…Construction delay in Bangladesh is a common problem, and it can hamper project schedules and increase costs (Hoque et al , 2021). In this study, the authors have offered a potential framework that includes the integration of 4D BIM technology for reducing delay in the context of Bangladesh.…”
Section: Discussionmentioning
confidence: 99%
“…Construction delay in Bangladesh is a common problem, and it can hamper project schedules and increase costs (Hoque et al , 2021). In this study, the authors have offered a potential framework that includes the integration of 4D BIM technology for reducing delay in the context of Bangladesh.…”
Section: Discussionmentioning
confidence: 99%
“…However, the critical project delay factors did not have a noticeable relationship among other continents. Various financial situations, availability of resources, government regulations etc., have led to the difference in delay factors between continents [ 10 ]. Therefore, to provide a better understanding, these articles were recategorised into three based on the continent where the authors have addressed the research problem.…”
Section: Introductionmentioning
confidence: 99%
“…No difference was reported between the delay factors caused in design-build projects and design bid-build projects. Hoque, Safayet [ 10 ] confirmed that payment delays and errors during construction were the most significant delay factors in Bangladesh. Although ranked based on their importance, the effect of delay factors on the overall project duration was not analysed.…”
Section: Introductionmentioning
confidence: 99%
“…As a matter of fact, much has been written and discussed on this subject matter. However, notwithstanding all these efforts, the soaring trend in the global cases of housing construction project abandonment gives one much concern in the view of global clamour for housing sustainability and healthy living (Hoque et al, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…As a matter of fact, much has been written and discussed on this subject matter. However, notwithstanding all these efforts, the soaring trend in the global cases of housing construction project abandonment gives one much concern in the view of global clamour for housing sustainability and healthy living (Hoque et al, 2021).This article, having perused existing literature on the nature, causes, effects, and remedies to housing project abandonment, proffers a renewed integration among the stakeholders within the housing sector involved from the project…”
mentioning
confidence: 99%