Analysis of stabilisation method of gable walls of a barrack located at the section BI of the former KL Auschwitz II-Birkenau

Abstract: The subject of the article is an analysis of the stabilisation method of the western gable walls of a barrack with the inventory number B-123, situated at the section BI of the former German Nazi concentration and extermination camp Auschwitz II-Birkenau. The barracks of the former Birkenau have a documentary and historical value and are subject to protective conservation. A barrack with inv. no. B-123 had been erected in the last months of 1941 as a residential barrack, then it was used as a hospital facility… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

3
4

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 2 publications
0
5
0
Order By: Relevance
“…The concentration and extermination camp Auschwitz-Birkenau was functioning in the years 1940-1945 [1] Construction of the Birkenau camp began with some haste in the autumn of 1941.The buildings at section BI were erected in poor atmospheric conditions and the construction material was taken from dismantling houses of nearby villages [2,3]. During the time of the camp functioning in the sector BI, which was divided in addition into BIa and BIb, there were more than 80 buildings.…”
Section: Introductionmentioning
confidence: 99%
“…The concentration and extermination camp Auschwitz-Birkenau was functioning in the years 1940-1945 [1] Construction of the Birkenau camp began with some haste in the autumn of 1941.The buildings at section BI were erected in poor atmospheric conditions and the construction material was taken from dismantling houses of nearby villages [2,3]. During the time of the camp functioning in the sector BI, which was divided in addition into BIa and BIb, there were more than 80 buildings.…”
Section: Introductionmentioning
confidence: 99%
“…Deflected constructions are usually stabilized by reinforcing their foundation with piles [12]. The deflected single elements of the structure are stabilised in a new position [13]. In particular situations, structural elements [14] or whole constructions [15] are rectified.…”
Section: Introductionmentioning
confidence: 99%
“…Leaning objects are most often stabilized by strengthening the foundations with steel piles [18] or reinforced concrete piles [19], or by strengthening the soil [4]. In the case of tilted individual structural elements, they are stabilized in a new position [20]. In special cases, building elements [21][22] or entire buildings [23][24] are rectified.…”
Section: Introductionmentioning