2009
DOI: 10.15802/stp2009/14479
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of the Asynchronous Flexible Thread Main Parameters of Repair Cars and Calculation Methods

Abstract: Advantages of stream methods of production are demonstrated. Causes affecting their insufficient use in existing repair of wagons are considered. Further ways of realization of stream idea in wagon repair activities are suggested. Main notions of asynchronous flexible stream of repair of freight wagons are given. Configuration solutions of the flexible stream organization are presented. The calculation procedure of basic parameters of such a stream is given.

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles