Analysis on Deformation and Stress Characteristics of a Multibraced Pit‐in‐Pit Excavation in a Subway Transfer Station

Abstract: As an important part of subway transfer station construction, pit-in-pit (PIP) excavation has always been a key object of monitoring and control. In this study, taking the PIP excavation project of Hefei metro line 4 and line 7 transfer station as the background, combined with on-site monitoring and numerical simulation, the variation law of lateral wall displacement, ground surface settlement, and strut force during the PIP excavation were analyzed. The results showed that the maximum lateral deformation of t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(7 citation statements)
references
References 18 publications
1
6
0
Order By: Relevance
“…The uplift at the bottom of the foundation pit of the auxiliary tunnel was also controlled within 3 cm. This is consistent with the results of previous studies [28][29][30].…”
Section: Resultssupporting
confidence: 94%
“…The uplift at the bottom of the foundation pit of the auxiliary tunnel was also controlled within 3 cm. This is consistent with the results of previous studies [28][29][30].…”
Section: Resultssupporting
confidence: 94%
“…FEM Model. A three-dimensional numerical model was established with GTS/NX software, which has often been used in the excavation simulation [29,30]. e model of the shielding tunnels undercrossing the pipeline was established to simulate the whole process of the construction, and the sizes of the tunnels and the pipeline in the model were consistent with the actual sizes.…”
Section: Three-dimensional Numerical Modelmentioning
confidence: 99%
“…e basic mechanical parameters of the soil were provided in the geological report. e parameters we needed mainly referred to the study of Shi et al [30]. In [30], the data was obtained from experiments and verified with the field measured data.…”
Section: Materials Model and Parametersmentioning
confidence: 99%
See 1 more Smart Citation
“…e design depth of the foundation pit of Jianguo Road Station of Hangzhou Metro Line 5 is 25.6 m. e reinforced concrete brace has tensile stress, and the maximum tensile force is about 1500 kN [9]. e design depth of the foundation pit of an air shaft of a subway in Shanghai is 25.07 m, and the reinforced concrete brace has tension during construction [10,11].…”
Section: Introductionmentioning
confidence: 99%