2000
DOI: 10.1080/014461900370807
|View full text |Cite
|
Sign up to set email alerts
|

Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process

Abstract: Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process his item ws sumitted to voughorough niversity9s snstitutionl epository y theGn uthorF Citation: esxD FeFD PHHHF enlytil hesign lnning ehnique @eheAX dependeny struture mtrix tool to shedule the uilding design proessF gonstrution wngement nd ionomisD IV@PAD ppF IUQ E IVPF Additional Information:• his is n eletroni version of n rtile pulished in esxD FeFD PHHHF enlytil design plnning tehnique … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
76
0
2

Year Published

2004
2004
2022
2022

Publication Types

Select...
4
3
3

Relationship

0
10

Authors

Journals

citations
Cited by 116 publications
(78 citation statements)
references
References 13 publications
0
76
0
2
Order By: Relevance
“…In the approach, a library of generic construction processes is used to construct a customised process model for a specific project, which can be viewed as a Task DSM and then sequenced to minimise the scope of cycles that may cause iteration. Identifying dependency loops that remain and finding ways to eliminate them, for instance by splitting some tasks into several parts, allows the project to be sequenced and a schedule to be produced (Austin et al 2000). More recently, Romero et al (2008) introduce an enhanced IDEF0?…”
Section: Task Dependency Modelsmentioning
confidence: 99%
“…In the approach, a library of generic construction processes is used to construct a customised process model for a specific project, which can be viewed as a Task DSM and then sequenced to minimise the scope of cycles that may cause iteration. Identifying dependency loops that remain and finding ways to eliminate them, for instance by splitting some tasks into several parts, allows the project to be sequenced and a schedule to be produced (Austin et al 2000). More recently, Romero et al (2008) introduce an enhanced IDEF0?…”
Section: Task Dependency Modelsmentioning
confidence: 99%
“…The importance of efficient design management to ensuring the smooth running of a project is being increasingly appreciated (Luh et al, 1999;Austin et al, 2000;Wang et al, 2006). Much research has been undertaken to better control the design process, and thus increase the effectiveness of the management of design duration.…”
Section: Literature Review On Design Managementmentioning
confidence: 99%
“…In this field of research, solution concepts focus on performance improvement of different aspects of small and large construction projects: i.e. selection procedures (Abu Dabous and Alkass, 2008), partnering (Yeung et al, 2008), design processes (Austin et al, 2000), and bidding management (Dawood, 1995). Another important category includes studies focusing on performance improvement of different aspects of organizations active in the construction industry and their relations (Voordijk, 2011).…”
Section: Knowledge For Action: Design Researchmentioning
confidence: 99%