2019
DOI: 10.1002/cepa.1166
|View full text |Cite
|
Sign up to set email alerts
|

Application of Parametric Design in Project Containing Steel Structures: Parametric Light‐rail Steel Bridge

Abstract: Traditionally, engineers await for a locked geometry from architects before modeling work starts. This is to avoid many changes and thereby risk of wasting time and money in the traditional manual way of working. With parametric design, we set up the design to cope with many changes and it is therefore adaptable for projects with many changes.With the parametric approach, we deliver a 3D model and FEM calculations model in the early project phases without any time wasted for the coming changes in the project g… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
0
0
Order By: Relevance
“…This digital reconstruction can be put into action with automatic or semi-automatic methodologies that use survey data (e.g., point clouds) to generate models, for example, in IFC format, or for the automatic detection of the bridge elements and related damage information [21,59,[61][62][63][64]. In addition, between BIM and FEM, the adoption of an adequate parametric strategy allows one to manage highly complex projects and facilitates collaborations between different disciplines or technicians [65][66][67]. BIM models, built in accordance with specific O&M requirements, can enable the extraction and exchange of data directly with existing asset management systems [68].…”
Section: Bim Methodologies Integrated With Other Technologiesmentioning
confidence: 99%
“…This digital reconstruction can be put into action with automatic or semi-automatic methodologies that use survey data (e.g., point clouds) to generate models, for example, in IFC format, or for the automatic detection of the bridge elements and related damage information [21,59,[61][62][63][64]. In addition, between BIM and FEM, the adoption of an adequate parametric strategy allows one to manage highly complex projects and facilitates collaborations between different disciplines or technicians [65][66][67]. BIM models, built in accordance with specific O&M requirements, can enable the extraction and exchange of data directly with existing asset management systems [68].…”
Section: Bim Methodologies Integrated With Other Technologiesmentioning
confidence: 99%