Application of reliability-centered maintenance for productivity improvement of open pit mining equipment: Case study of Sungun Copper Mine

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 41 publications
(14 citation statements)
references
References 19 publications
0
14
0
Order By: Relevance
“…However, it has to be previously demonstrated that it is possible for the mathematical model of STAT operation implementation to be used in the form of a Markov process. In order to get that done consider an identification problem with the composite function [11], which is minimized by the same parameters as the optimality criterion of the STAT (20):…”
Section: Methodsmentioning
confidence: 99%
“…However, it has to be previously demonstrated that it is possible for the mathematical model of STAT operation implementation to be used in the form of a Markov process. In order to get that done consider an identification problem with the composite function [11], which is minimized by the same parameters as the optimality criterion of the STAT (20):…”
Section: Methodsmentioning
confidence: 99%
“…According to Stamatelatos, 16 homogeneity of a data set is satisfied when there are identical items and similar circumstances including similarity in design, hardware, installation, function, operation process, system specification, operating environment and mission times. 17 In contrast, heterogeneity of a data set refers to varieties in systems, specifications and operation conditions. In this situation, there are some covariates affecting the time-to-event data (e.g.…”
Section: Methodology and Framework Of Researchmentioning
confidence: 99%
“…Renewal process (RP) method is employed to characterize its failure behavior profile. For more information about this phase, refer to Morad et al 17 Covariate-based model (phase C)…”
Section: Time-based Probabilistic Model (Phase B)mentioning
confidence: 99%
“…Then in order to achieve a proper and practicable maintenance schedule, a task package was suggested for the drum shearer machine in the Tabas coal mine. Morad et al (2014) assessed the reliability of ten trucks and computed importance of each component was weighted by the importance measure method. This study showed the impact of critical items on the availability of machines.…”
Section: Literature Reviewmentioning
confidence: 99%