2019
DOI: 10.1109/jsyst.2019.2918645
|View full text |Cite
|
Sign up to set email alerts
|

Arrester Thermal Stability Control: Implementing a Combination of Countermeasures During Power System Restoration: A Real Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 16 publications
0
4
0
Order By: Relevance
“…Moreover, an arrester explosion has happened during the black start of a 250 MW generation unit in the Iranian national grid [43], and also, the detailed electromagnetic simulation results presented in [44] (in which the nonlinear behavior of transformer core is modeled using three different models described in References [45][46][47]) show that the effect of transformer switching transients may result in the explosion of the arrester. erefore, effective countermeasures (such as controlled switching [48]) should be applied in order to control the overvoltages and keep the arrester safe.…”
Section: Transformers Energizationmentioning
confidence: 99%
See 1 more Smart Citation
“…Moreover, an arrester explosion has happened during the black start of a 250 MW generation unit in the Iranian national grid [43], and also, the detailed electromagnetic simulation results presented in [44] (in which the nonlinear behavior of transformer core is modeled using three different models described in References [45][46][47]) show that the effect of transformer switching transients may result in the explosion of the arrester. erefore, effective countermeasures (such as controlled switching [48]) should be applied in order to control the overvoltages and keep the arrester safe.…”
Section: Transformers Energizationmentioning
confidence: 99%
“…[110] Control measure to maintain arrester safety during trans. switching [44] Analyzing self-excitation in Finnish Grid [49] MIP formulation for controlled islanding and black start allocation [64] Analyzing the application of ESSs in restoration [108] A report about black start using ESSs in California [99] Analyzing the offshore wind farm in restoration [100] Challenges faced by offshore wind farms in black start [102] Online evaluation of line switching overvoltage [41] Based on historical data, relays data, weather condition [55] HIMSHT to deter.…”
Section: Application Of Renewable and Vsc-based Resources In Power Gr...mentioning
confidence: 99%
“…Energizing transformers can induce a significant non-sinusoidal inrush current, especially with residual flux, leading to mechanical stress, relay tripping, and voltage sags affecting power quality [ 28 , 29 , 30 , 31 ]. Resonance risks, causing temporary overvoltages (TOVs) and potential transformer winding failures, are explored in [ 32 , 33 , 34 ]. Ref.…”
Section: Introductionmentioning
confidence: 99%
“…Ref. [ 32 ] examines uncertainties affecting resonant overvoltages during transformer energization. Ref.…”
Section: Introductionmentioning
confidence: 99%