2022
DOI: 10.1049/hve2.12246
|View full text |Cite
|
Sign up to set email alerts
|

Audible noise evaluation for six‐phase overhead lines transformed from existing three‐phase double circuit infrastructures with uprated voltages

Abstract: The drive to reduce carbon emissions and meet climate change targets set by governments worldwide has led to the growth of renewable energy sources and electric vehicles in recent years. Resulting intermittent generation and centralised demand require increased transmission capacities when operating associated power systems. Existing transmission lines are not capable of meeting planned needs. In many countries, obtaining a new right of way to build an overhead line (OHL) is increasingly difficult. There is th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 37 publications
0
0
0
Order By: Relevance