Automated Continuous Commissioning of Commercial Buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2013
2013
2017
2017

Publication Types

Select...
2
1

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…A comparison of load predictions between the ROM and the EnergyPlus model was conducted for Building 7230 where there was a calibrated EnergyPlus model [16].…”
Section: Comparison Of Results From Energyplusmentioning
confidence: 99%
See 3 more Smart Citations
“…A comparison of load predictions between the ROM and the EnergyPlus model was conducted for Building 7230 where there was a calibrated EnergyPlus model [16].…”
Section: Comparison Of Results From Energyplusmentioning
confidence: 99%
“…Additional metering is required to calibrate models and accurately measure energy consumption to validate results. For Building 7230, the existing instrumentation system from ESTCP project SI-0929 [16] was utilized with additional measurements (i.e., chilled water BTU meters at the AHU local level). For Buildings 7113 and 7114, sub-meters (DEM) were installed to measure lighting and plug loads at building level.…”
Section: Building 7230mentioning
confidence: 99%
See 2 more Smart Citations
“…Importantly, the system incorporated learning algorithms and simplified reduced‐order simulation models to circumvent the need to manually construct and maintain a detailed building simulation model. This detailed building model is required for the existing technology and represents a practical barrier to a broad scalable application.…”
Section: Background and Existing Workmentioning
confidence: 99%