2021
DOI: 10.1016/j.aei.2021.101346
|View full text |Cite
|
Sign up to set email alerts
|

Automation and optimization in crane lift planning: A critical review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 23 publications
(3 citation statements)
references
References 138 publications
0
3
0
Order By: Relevance
“…These decisions can be time-consuming and largely depend on the experiences of human planners [5]. Automatic lift planning for cranes is a promising tool for improving the safety and efficiency of the crane lifting process [6].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…These decisions can be time-consuming and largely depend on the experiences of human planners [5]. Automatic lift planning for cranes is a promising tool for improving the safety and efficiency of the crane lifting process [6].…”
Section: Introductionmentioning
confidence: 99%
“…To improve the quality of planned paths, the time efficiency, safety, ease of operation, and visibility should be considered. Despite mounting pressures caused by increasing energy costs, the problem of energy efficiency during crane lifting has not been sufficiently studied [4], [6], [9]. Future studies will inevitably combine these factors to generate a quality planning model.…”
Section: Introductionmentioning
confidence: 99%
“…Other challenging research tasks include stability analysis with swinging payloads [ 22 ], outrigger loads determination [ 23 ], movement trajectory optimization [ 7 ], heavy lift path planning [ 24 , 25 ], lift planning automation [ 26 , 27 ], and computational approaches for load positioning [ 28 , 29 ].…”
Section: Introductionmentioning
confidence: 99%