2012
DOI: 10.1007/s10479-012-1203-5
|View full text |Cite
|
Sign up to set email alerts
|

Balancing of simple assembly lines under variations of task processing times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
20
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
5
4
1

Relationship

1
9

Authors

Journals

citations
Cited by 66 publications
(20 citation statements)
references
References 27 publications
0
20
0
Order By: Relevance
“…Other authors have also tackled some variants of combinatorial optimization problems: stability aspects of the solutions for the traveling salesman problem when the k ‐best solution procedure is applied (cf., Libura et al., ); the sensitivity analysis of the solutions for scheduling problems (cf., Hall and Posner, ); the so‐called balancing of simple assembly where the stability of approximate and optimal solutions, under variations of the processing time of some tasks, has been tackled in Gurevsky et al. (), searching for the stability of the solutions for the minimum spanning tree (cf., Pettie, ); and the lot‐sizing problem (cf., van Hoesel and Wagelmans, ). Other studies on sensitivity and stability analyses can be found in Emelichev and Podkopaev (), Libura (), and Woeginger ().…”
Section: Related Workmentioning
confidence: 99%
“…Other authors have also tackled some variants of combinatorial optimization problems: stability aspects of the solutions for the traveling salesman problem when the k ‐best solution procedure is applied (cf., Libura et al., ); the sensitivity analysis of the solutions for scheduling problems (cf., Hall and Posner, ); the so‐called balancing of simple assembly where the stability of approximate and optimal solutions, under variations of the processing time of some tasks, has been tackled in Gurevsky et al. (), searching for the stability of the solutions for the minimum spanning tree (cf., Pettie, ); and the lot‐sizing problem (cf., van Hoesel and Wagelmans, ). Other studies on sensitivity and stability analyses can be found in Emelichev and Podkopaev (), Libura (), and Woeginger ().…”
Section: Related Workmentioning
confidence: 99%
“…For instance, Gurevsky et al (2012) dealt with the SALBP-E when having task times within intervals and proposed a way to find a compromise between the objective function minimization and a stability ratio (a parameter to reflect the risk aversion coefficient of a decision maker and the conservatism). A related stability study was done in Gurevsky et al (2013) but for the case of an ALB problem where a workstation can have several workplaces, there are exclusion constraints, and the processing times of the tasks can vary during the line life cycle.…”
Section: Robust Optimization For Assembly Line Balancingmentioning
confidence: 99%
“…In some environments, however, the time duration of all or some of the tasks may change during the life cycle of the line due to instability of operators pace, motivation, changes in product and station characteristics, etc. The effect of such phenomena on the line balance, and some analytical properties on the stability of the line were given in Sotskov et al (2006), Gurevsky et al (2012), Sotskov et al (2012) and others.…”
Section: Literature Reviewmentioning
confidence: 99%