Tubular Structures XV 2015
DOI: 10.1201/b18410-17
|View full text |Cite
|
Sign up to set email alerts
|

Beam to concrete-filled rectangular hollow section column joints using long bolts

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…Other less fabrication-intensive connection details have also been explored involving various bolting techniques. A conceptually simple bolted connection involving bolts long enough to go through the column section has been experimentally investigated by Hoang et al [17] for concrete filled SHS. However, the resulting connection detail is difficult to execute on site and could induce additional cost.…”
mentioning
confidence: 99%
“…Other less fabrication-intensive connection details have also been explored involving various bolting techniques. A conceptually simple bolted connection involving bolts long enough to go through the column section has been experimentally investigated by Hoang et al [17] for concrete filled SHS. However, the resulting connection detail is difficult to execute on site and could induce additional cost.…”
mentioning
confidence: 99%