2022
DOI: 10.1109/access.2022.3148253
|View full text |Cite
|
Sign up to set email alerts
|

Bi-Level Multi-Objective Planning Model of Solar PV-Battery Storage-Based DERs in Smart Grid Distribution System

Abstract: This paper presents a novel bi-level multi-objective model for planning solar PV-battery storage (PV-BS) based DERs in Smart grid distribution system (SGDS). The planning of Solar PV and battery storage (BS) in the distribution system presents severe complexities for the system planner due to their inherent attributes. The detailed analysis considering all three planning aspects, namely technical, economics, and environmental is presented, assisting in the efficient and reliable planning operation. The four te… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 15 publications
(5 citation statements)
references
References 28 publications
0
5
0
Order By: Relevance
“…It enables the automatic control of population size and other parameters at run time to improve the search efficiency and convergence speed. Butterfly PSO [ 26 ]:- It solves the optimization problems by imitating the butterfly behavior during the food search and the mating process. Using the above equations, NCC-based scheduling optimization technique (Algorithm 1) is developed and implemented.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…It enables the automatic control of population size and other parameters at run time to improve the search efficiency and convergence speed. Butterfly PSO [ 26 ]:- It solves the optimization problems by imitating the butterfly behavior during the food search and the mating process. Using the above equations, NCC-based scheduling optimization technique (Algorithm 1) is developed and implemented.…”
Section: Methodsmentioning
confidence: 99%
“…Butterfly PSO [ 26 ]:- It solves the optimization problems by imitating the butterfly behavior during the food search and the mating process. …”
Section: Methodsmentioning
confidence: 99%
“…However, the main complexity of multi-objective optimization lies in the potential existence of conflicts between the functions to be optimized. This forces grid operators to develop strategies allowing to optimize their operation according to their specific interests and to apply expert judgment with the purpose of selecting the best option [97].…”
Section: ) Mathematical Formulationmentioning
confidence: 99%
“…The study in [5] proposed the planning concept of prioritizing the optimization of the grid structure and then considering increasing the transformer capacity, which reduced substation investment compared to Energies 2023, 16, 5648 2 of 21 traditional planning methods. The study in [6,7] took the replacement of feeders and the location and capacity of the DG as the planning content and constructed a cost-oriented planning model, whose objective function included the investment costs of feeders and the DG. The studies in [8,9] considered the differences in interests between DG investors and power distribution companies based on a source-grid-load three-layer model and discussed the impact of DR on planning.…”
Section: Introductionmentioning
confidence: 99%